Kitchens and baths
Kitchen and bath remodels pull up floors and open walls, so several materials are in play at once. Each is sampled before the remodel crew arrives.
Typical cost in Huntington Beach
The South Coast Air Quality Management District’s rule sorts jobs two ways. Stripping or removing parts of a building is renovation, and wrecking a structural member that carries load is demolition, which includes a bearing wall coming out.
Whatever tested positive comes out before the remodel or demolition crew arrives. In Huntington Beach the city’s Permit & Asbestos Disclosure Form goes in with the permit.

Kitchen and bath remodels pull up floors and open walls, so several materials are in play at once. Each is sampled before the remodel crew arrives.
A family room addition or a new opening in an existing wall means cutting into the house you have. The survey and the disclosure form both come before that cut.
A teardown needs the survey and a district notice before the crew starts. We file the notice online and give you the copy the permit application calls for.
These buildings sit outside the single-unit carve-outs: apartment buildings, townhouses and condominiums are not single-unit dwellings under the rule. Jobs there go through the full survey and notice steps.
Several offices each need something from a demolition or renovation job, and the order matters.
In Huntington Beach the signature on the Permit & Asbestos Disclosure Form promises that the district will be notified. You keep that promise when the Rule 1403 notice is on file before the removal starts. The form also says a Certified Asbestos Consultant surveys the building if needed.
The abatement contractor files the notice through the district’s online Rule 1403 Notification Web Application, no later than 10 working days before any demolition or renovation activities. A notice without the required fee is not considered received. Renovation of a residential single-unit dwelling that removes or strips less than 100 square feet of surface area of asbestos-containing material falls outside the notification requirement.
The permit applicant brings the building department a copy of the notification that was filed with the district. The district points to state law for this requirement.
Before you sign, ask for the company’s license number and confirm with the Contractors State License Board that it shows the C-22 Asbestos Abatement classification or that its qualifier passed the asbestos certification exam. Cal/OSHA registration is valid for one year, so on a job of 100 square feet or more check the date on it as well as the company name.
A separate consultant runs the clearance air test. Friable waste with 1 percent or more asbestos is California hazardous waste and leaves with a licensed hauler and a manifest, so keep the hauler’s manifest with the permit and the disclosure form.

Start with asbestos testing and surveys, or see everything on the home page.
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 301-3488