Asbestos removal services in Huntington Beach
Find the service that fits your job.
A certified consultant takes samples, and the lab report shows which materials tested positive before your project starts.
Popcorn ceiling removalTextured ceilings are sampled first, and ceiling texture that tests positive is removed with the paperwork its size calls for.
Floor tile and mastic removalVinyl tile, sheet vinyl and the mastic under them are sampled layer by layer, and flooring that tests positive is removed.
Drywall, joint compound and plaster removalDrywall, joint compound and plaster are sampled before a remodel opens the wall, and positive material is removed first.
HVAC duct and pipe insulation removalDuct wrap, tape and pipe insulation are sampled before an HVAC change-out, and positive material is removed.
Renovation and demolition abatementPositive materials are cleared from remodels and teardowns before the crew arrives, with the district notice filed first.
Request a free asbestos removal quote
We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.
Call (657) 301-3488