Popcorn Ceiling Removal in Huntington Beach

Typical cost in Huntington Beach

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

A popcorn ceiling is textured, and the texture may contain asbestos. A lab result is the only way to tell, so we have the ceiling sampled before anyone plans a scrape.

If the result is positive, we plan the removal around the ceiling area involved and the paperwork that size of job calls for. New texture and paint come after the ceiling is done.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and a side window looking onto trees, and a doorway to a hall.

Ceiling jobs we handle

One room or several

A single bedroom ceiling and a ceiling across the whole house follow the same steps. The rule counts the surface area of asbestos material removed or stripped, so the total area decides which paperwork applies.

Painted or patched texture

Paint, patches and a coat of newer texture do not show what is underneath. A lab result does, and the sample comes before anything is scraped.

Water-stained ceilings

A stain is a reason to look at a ceiling, not a test result. The sample still decides whether the texture contains asbestos.

Skylights and new lighting

A plan that cuts into the ceiling, such as a skylight or new recessed lighting, is a good moment to get the texture tested. The result tells you what the crew will be cutting through.

The paperwork for a ceiling job

Ceiling work is renovation, so the district notice and the state’s contractor rules both depend on how much area is involved.

The district notice

The district notice has to be in no later than 10 working days before work starts, and it is not counted as received unless the notification fee comes with it. A renovation of a residential single-unit dwelling that removes or strips less than 100 square feet of asbestos-containing surface area is outside the notification requirement.

Registration and licensing at 100 square feet

Once a job involves 100 square feet or more of surface area of asbestos-containing material, the company doing the work must hold a Cal/OSHA registration. The contractor must also hold the C-22 Asbestos Abatement classification or have a qualifier who passed the asbestos certification exam, so ask for the license number and check it with the Contractors State License Board.

After the ceiling is out

Removal leaves a bare ceiling, so patching, new texture and paint are separate work. When the job includes a clearance air test, a separate consultant runs it.

Upstairs hall with a textured ceiling, a wooden stair rail, clear plastic over the floor and walls and a portable air machine with a flexible hose at the far end.

Not sure about your ceiling? Start with asbestos testing and surveys, and use the front page to find our other services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (657) 301-3488

Call (657) 301-3488